FreeTrack Forum

Welcome, you're not connected. ( Log in - Register )

RSS >  3 point construction lengths
patio87 #1 13/01/2009 - 00h28

Class : Apprenti
Posts : 4
Registered on : 01/12/2008

Off line

Is there specific length I need to have the rods at when building the 3point?

And I am using regular IR led's, not the really short kinds, I have heard about shimming the LED's down, but how far to I need to grind them down, and once it's ground down do I need to do anything else, because it's probably going to be fairly rough?
desrat #2 17/01/2009 - 03h07

Class : Apprenti
Posts : 12
Registered on : 10/01/2009

Off line

Is there specific length I need to have the rods at when building the 3point?



I believe freetrack will work better if you use the pre-set measurements (look in "model" tab of the software)

And I am using regular IR led's, not the really short kinds, I have heard about shimming the LED's down, but how far to I need to grind them down, and once it's ground down do I need to do anything else, because it's probably going to be fairly rough?



Gring down to about 1.5mm from the diode itself with a file or some other method (I used high grit sand paper) then use very fine wet 'n' dry sand paper to get the casing clear & smooth again.

 >  Fast reply

Message

 >  Stats

1 user(s) connected during the last 10 minutes (0 member(s) and 1 guest(s)).